NI 43-101 Technical Report (PEA) for the Lola Project in Africa, Guinea dated 2018 (Q38579): Difference between revisions
From geokb
(Changed an Item: Added missing Zotero attachment key and content URL) |
(Changed an Item: Added missing Zotero attachment key and content URL) |
||
Property / P143 (Deleted Property) | |||
Property / P143 (Deleted Property): IET375SR Property P143 not found, cannot determine the data type to use. / rank | |||
Property / content URL | |||
Property / content URL: https://www.zotero.org/groups/4530692/usgs_ni_43-101_reports/items/RQF8MTDM/attachment/IET375SR/reader / rank | |||
Property / P143 (Deleted Property) | |||
7U8BHSPW Property P143 not found, cannot determine the data type to use. | |||
Property / P143 (Deleted Property): 7U8BHSPW Property P143 not found, cannot determine the data type to use. / rank | |||
Normal rank | |||
Property / content URL | |||
Property / content URL: https://www.zotero.org/groups/4530692/usgs_ni_43-101_reports/items/RQF8MTDM/attachment/7U8BHSPW/reader / rank | |||
Normal rank |
Revision as of 01:03, 18 November 2023
an NI 43-101 Technical Report pulled from the GeoArchive collection
Language | Label | Description | Also known as |
---|---|---|---|
English | NI 43-101 Technical Report (PEA) for the Lola Project in Africa, Guinea dated 2018 |
an NI 43-101 Technical Report pulled from the GeoArchive collection |
Statements
2 references
Linkage to this mine was established with a simple name match from imperfect metadata identifying the geographic area of the mining project
P143 (Deleted Property)
7U8BHSPW Property P143 not found, cannot determine the data type to use.
0 references