NI 43-101 Technical Report for the Preston Project in Wisconsin, United States dated 2017 (Q35934): Difference between revisions

From geokb
(‎Changed an Item: Updated item with metadata URL and cleaned up old claims)
(‎Changed an Item: Added missing Zotero attachment key and content URL)
Property / P143 (Deleted Property)
 
P8RNDTK7 Property P143 not found, cannot determine the data type to use.
Property / P143 (Deleted Property): P8RNDTK7 Property P143 not found, cannot determine the data type to use. / rank
 
Normal rank
Property / content URL
 
Property / content URL: https://www.zotero.org/groups/4530692/usgs_ni_43-101_reports/items/PNIR5EHQ/attachment/P8RNDTK7/reader / rank
 
Normal rank

Revision as of 23:49, 17 November 2023

an NI 43-101 Technical Report pulled from the GeoArchive collection
Language Label Description Also known as
English
NI 43-101 Technical Report for the Preston Project in Wisconsin, United States dated 2017
an NI 43-101 Technical Report pulled from the GeoArchive collection

    Statements

    2 references
    Linkage to this mine was established with a simple name match from imperfect metadata identifying the geographic area of the mining project
    0 references
    P143 (Deleted Property)
    P8RNDTK7 Property P143 not found, cannot determine the data type to use.
    0 references