Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California (Q56292): Difference between revisions
From geokb
(Changed an Item: Added addresses place claims to publication from Pubs Warehouse country/state/county information that was successfully linked by name to GeoKB labels) |
(Changed an Item: Added links to content for publication) |
||
Property / content URL | |||
Property / content URL: https://pubs.usgs.gov/of/2020/1141/ofr20201141.pdf / rank | |||
Normal rank | |||
Property / content URL: https://pubs.usgs.gov/of/2020/1141/ofr20201141.pdf / reference | |||
Revision as of 17:44, 11 August 2023
Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3...
Language | Label | Description | Also known as |
---|---|---|---|
English | Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California |
Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3... |