Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California (Q56292): Difference between revisions

From geokb
(‎Created a new Item: Added initial Pubs Warehouse item for USGS Series Report)
 
(‎Changed an Item: Added contributors to publication from Pubs Warehouse)
Property / author
 
Property / author: Kristin Byrd, Ph.D. / rank
 
Normal rank
Property / author: Kristin Byrd, Ph.D. / reference
 

Revision as of 13:22, 28 July 2023

Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3...
Language Label Description Also known as
English
Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California
Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3...

    Statements