Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California (Q56292): Difference between revisions
From geokb
(Created a new Item: Added initial Pubs Warehouse item for USGS Series Report) |
(Changed an Item: Added contributors to publication from Pubs Warehouse) |
||
Property / author | |||
Property / author: Kristin Byrd, Ph.D. / rank | |||
Normal rank | |||
Property / author: Kristin Byrd, Ph.D. / reference | |||
Revision as of 13:22, 28 July 2023
Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3...
Language | Label | Description | Also known as |
---|---|---|---|
English | Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California |
Curtis, J., Poitras, T., Bond, S., and Byrd, K., 2021, Sediment mobility and river corridor assessment for a 140-kilometer segment of the main-stem Klamath River below Iron Gate Dam, California: U.S. Geological Survey Open-File Report 2020–1141, 3... |